Bell Flow Systems Supply Flow Turbines to Heathrow

Sep 17, 2007

Heathrow Jet Fuel Supply monitored by Bell Flow Systems.

Airport

The purchase of several LFT precision stainless steel flow turbines ranging from 1" to 6" has been completed for installation at Heathrows' T5 terminal. These high~spec ATEX certified flow turbines are to be used in bunkering and mobile tanker operations and have been supplied fitted with both locally fitted and remote mounted Fluidwell flow computers.

The models supplied have linearised on-board calibration data to ensure extremely accurate and reliable results with 10 Year EEPROM retention and Lithium battery back-up.